Guides for decision-makers
What to expect when you get a vending machine installed
Most people who ask for a vending machine have never had one installed before. The questions are usually the same: how much room does it need, what kind of outlet, how long does it take, and what do we actually have to do? Here's the plain version.
Step 1: The request and the call
It starts with a name, a company, and a zip code. A Route One manager calls or emails to confirm the location, your headcount or traffic, the space you have in mind, and which machine makes sense: a beverage machine, a snack machine, or a combo that does both in one footprint.
Step 2: Checking the space
This is the part that matters most, and it's quick. What we look at:
- Floor space. Full-size machines are roughly the size of a large refrigerator. Plan for the machine itself plus a few inches behind it for airflow.
- Power. A standard grounded wall outlet within reach of the machine, ideally not shared with a microwave or another high-draw appliance. No extension cords.
- A level, solid floor. Machines are heavy when stocked.
- The path in. Doorways, hallways, tight turns, stairs, and elevators between the loading point and the final spot. Measuring the narrowest doorway ahead of time avoids surprises on install day.
- Foot traffic. The best spot is where people already walk: the break room, near the time clock, by the ice machine, or near a waiting area.
If you're not sure, send a couple of phone photos of the spot and the path to it. That usually answers everything.
Step 3: Install day
Most locations are up and running within about a week of approval. A crew delivers the machine, sets it in place, levels it, plugs it in, and loads the first fill. Someone at the location just needs to let the crew in and show them the spot. You don't need to move furniture beyond clearing the path, and nothing gets billed to you.
Step 4: The first fill
The starting lineup is planned around your location type: a warehouse, a gym, an apartment building, and a hotel all start differently. If you want your team's input before day one, we can run a short employee survey so the first stocking reflects what people actually want.
Step 5: Ongoing restocking and service
- Restocks. Your machine joins a standing route, typically every one to two weeks, more often for high-traffic locations.
- Adjusting the mix. We track what sells and swap out slow movers on each restock.
- Repairs. Call or text and we'll get someone out, usually within a day or two. Parts and repairs are on us.
- Cleaning. The machine is kept clean as part of the route.
What you're responsible for
Honestly, not much: the space, the outlet, and letting us know if something's wrong. There's no equipment cost, no lease, and no invoice. We earn revenue from what sells through the machine, which is why keeping it full and working is on us.
Frequently asked questions
How much space does a vending machine need?
Plan for roughly the footprint of a large refrigerator, plus a few inches behind it for airflow and a clear path to the spot. We confirm exact dimensions for your machine before install.
What kind of electrical outlet does a vending machine need?
A standard grounded wall outlet close to the machine, ideally not shared with high-draw appliances like a microwave. Extension cords aren't used.
How long does installation take?
Most locations are up and running within about a week of approval. The install itself is usually quick once the crew is on site.
Do we have to sign a long contract?
There's no equipment cost and no invoice. Ask us about terms on the first call and we'll walk you through them before anything is installed.
Related reading
Ready to check your space? Send us your zip code to start.
Get a Free Machine